In the professional workshop members including steel columns and beams were processed according to the detailed drawings of steel structure construction. Total weight of steel components is about 100 tons, with a processing cycle of 7-10 days.
Erection of lifting equipment: Before construction, lifting equipment needs to be erected to provide support during installation.
Lightweight and high strength: the specific gravity of steel is lighter than that of concrete, and the strength and toughness of steel are also very high, which can reduce the self-weight of buildings and improve the seismic capacity.