Two Storey Steel Warehouse
  • Two Storey Steel Warehouse Two Storey Steel Warehouse
  • Two Storey Steel Warehouse Two Storey Steel Warehouse
  • Two Storey Steel Warehouse Two Storey Steel Warehouse
  • Two Storey Steel Warehouse Two Storey Steel Warehouse

Two Storey Steel Warehouse

Model:YCXY-TSW-200

Yongcheng Xingye manufactures two storey steel warehouses that double usable floor area on the same plot. The ground level handles heavy pallets or equipment while the upper level takes light storage or offices. Frames are engineered to local loads. Send footprint and floor loads for a quote.

    Send Inquiry

    Product Description

    Double the Floor Area on One Plot

    A two storey steel warehouse puts a second floor over the same footprint, so a site with limited land holds twice the usable space. Yongcheng Xingye engineers the ground level for heavy pallets or equipment and the upper level for lighter storage, packing or offices. A welded H-section frame carries the floor system, with members fabricated to drawing and bolted on site. Buyers order by square metre. Send the footprint, heights and floor loads for a structural proposal.

    How the Two Levels Are Built

    Primary H-section columns and beams form the frame, and steel deck with a concrete topping forms the upper floor. Ground-floor bay spacing follows truck and racking layout, while upper-floor loading sets joist size and slab thickness. Stairs, goods lifts and external access can be built into the plan, and roof lights and ventilators are placed with the cladding. Services and floor penetrations are coordinated at drawing stage, so members arrive ready to install rather than cut on site.

    Specification at a Glance

    Item Specification
    Building Type Two-storey frame structure
    Ground Floor Load Heavy duty, to requirement
    Upper Floor Load 250-500 kg/m2
    Storey Height Ground 6-9 m / Upper 4-6 m
    Bay Spacing 6-8 m
    Main Frame Welded H-section, Q235 / Q355
    Floor System Steel deck with topping
    Secondary Frame Galvanised C / Z purlins
    Roof / Wall Corrugated sheet or sandwich panel
    Connection Bolts on site, factory welds
    Access Stair, goods lift, ramp
    Min Order 200 square metres
    Lead Time 30-45 days after drawings

    When a Second Floor Beats a Larger Site

    Adding a level makes sense where land is costly or the plot cannot grow. Storage and offices move upstairs while loading, vehicle turning and heavy equipment stay at ground level, so one footprint supports more work. Three factors shape project cost: the load rating of the upper floor, the height of each storey and the number of stairs or goods lifts. A steel frame erects faster than a comparable concrete building, so the facility opens sooner. Final figures come from the drawing set.

    Design Loads and Structure

    Every two storey steel warehouse is calculated for the loads specified by the project, from carton storage to pallet racking or machinery below. Column sections, floor beams and slab thickness follow from those figures, and bracing is designed for local wind and seismic conditions. Where heavier equipment is planned upstairs, the floor system is strengthened at the drawing stage. Layout drawings and load calculations are issued before fabrication begins.

    Erection Sequence on Site

    Reinforced footings take the columns, which rise storey by storey with a crane. Floor beams and deck follow the frame, and the slab is placed before wall cladding and openings. A sequenced drawing pack and numbered members keep the erection crew aligned, and bolted connections reduce the need for site welding. The building reaches a weather-tight shell before internal fit-out starts. Programme length depends on floor area, access and the number of levels.

    Packing, Shipping and Loading

    Columns and beams travel in nested bundles with protected edges, deck panels ship stacked and film-wrapped, and bolts and small fittings pack into sealed cases. Each part carries a mark matching the assembly drawing, so materials sort by storey on arrival. A two-storey building loads by square metre and tonne rather than by unit, and the exact figure depends on member sections and packing density. Request a loading plan once the member schedule is fixed.

    Quality Complaints and Spare Parts

    Missing or damaged components are replaced from the spare pack shipped with each order. The export desk answers complaint emails within one working day with photos and a dispatch plan. A claim should include the part mark, the number on the packing list and clear photos of the fault, so the correct replacement leaves the first time. Defects confirmed by inspection are covered under the written warranty. Damage from site handling falls outside cover and can be quoted as spares.

    About Yongcheng Xingye

    Founded in 2009, Beijing Yongcheng Xingye Steel Structure Co., Ltd. runs a head office in Shunyi District, Beijing and a 3,000 square metre fabrication workshop in Hebei. Steel cutting, welding, roll forming and panel production run in-house, so frame quality and delivery dates stay under one chain.

    ISO 9001 and CE certification apply where relevant, and the export desk handles OEM and ODM orders for buyers in the Middle East, Africa, Southeast Asia and South America. Design support covers layout drawings and load calculations for the destination, with installation guidance supplied for overseas sites.

    Frequently Asked Questions

    What information is needed for a quotation?

    Send the footprint, storey heights, ground and upper floor loads, and the intended use. Beam sizes and a quantity take-off follow from those figures, and a layout drawing can be issued for review.

    How much does a two-storey building save on land?

    A second floor roughly doubles floor area on the same footprint, which suits sites where land is limited or expensive. The exact gain depends on how much of the upper level is used rather than left as void.

    What loads can each floor carry?

    The ground level is engineered for heavy storage or equipment, and the upper level is commonly designed for 250 to 500 kg/m2. State both loads at enquiry so members and the floor system are sized correctly.

    Can goods be moved between the floors?

    Stairs, goods lifts and external ramps can be built into the layout. Access choice depends on the load being moved and how often materials pass between levels.

    Is the frame welded or bolted on site?

    Main joints are welded in the factory and bolted on site, so erection needs a smaller crew and no extensive hot work. Site welds are limited to connections specified in the drawing set.

    How long does erection take?

    The programme depends on floor area, site access and crane availability. Numbered members and a sequenced drawing pack let the crew work storey by storey without re-handling parts.

    Do you provide installation support?

    Numbered components, sequenced drawings and video guidance ship with the order. For major projects, an engineer can attend site for supervision and training.

    A two storey steel warehouse doubles usable floor area without buying more land. Send the footprint, storey heights and floor loads to receive a layout drawing, a loading plan and a factory quote.

    Related Category

    Send Inquiry

    Please Feel free to give your inquiry in the form below. We will reply you in 24 hours.
    X
    We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy
    Reject Accept